Debrief
What went well / positives
- Despite a very small team, we set up and tore down really quickly.
- The labels were really good.
- We packed up with 5 people in about 30 minutes.
- Having only one table outside is sufficient.
- Having all caps on hand was good.
Instrumentation, sensors, and calibration
- V5 didn’t work for some reason. (Found to be wrong mapping)
- P4 wasn’t reading correctly. (Not screwed in all the way)
- The CGA fitting on the CO2 tank leaked, but it was fine when snugged up.
- Tank load cell calibration needs to be done.
Cameras and video coverage
- Not sure if we have a video of that; we need more cameras for sure.
- Ethernet cables for the cameras should be determined beforehand.
- Buy one or two more cameras for the next test.
GSE and pad layout / safety
- The GSE doesn’t fit through the door with the OX fill line connected.
- We need a bin on the pad for hoses and tank lids only.
- We need a wrench set on the pad with color-coded labels.
- We need to get caution tape.
- We need a multimeter in the tools packout.
- The packout needs a caliper section.
- We need a box for torque wrenches (maybe it fits in the packout).
- We need a supply of plastic bags.
- We need Tupperware for reusable plastic bags.
- PT wires don’t need labeled bags but should be individually bagged.
Procedures, SOPs, and operations
- We forgot to take a team picture.
- We need to have a meeting dedicated solely to SOPs beforehand next time.
- We need an SOP for fuel fill (covering the static vent method).
Networking, IT, and data systems
- The networking/power box should be upgraded.
- We need to get the UDM Pro MAC address whitelisted.
- Alternatively, use the UDR as an access point or buy an access point.
- We need networked variables.
- We need an audio interface.
- Set up live Cd calculation.
- Set up live plotting.
Radios and communication
- Check radio headsets.
- Practice radio usage.
Environment / misc
- We need to get the artwork up in the room.